Targets the deploy workflow at .github/workflows/gh-pages.yaml (currently lives in the v1 repo — will be inherited by v2 at migration time, so doing this upgrade now means v2 launches on a clean pipeline).
Context for execution
Everything a fresh session needs to start executing this plan without questions.
- Plan status: draft as of 2026-04-15. Check against the actual workflow file and action release dates before assuming these versions are still the right targets.
- Repo to edit:
github.com/owaspsamm/website(v1). Local path:c:/Users/Pat/Documents/work/OWASPSAMM/website. - File to edit:
.github/workflows/gh-pages.yamlin the v1 repo. - Current Hugo pin:
0.157.0(do not change as part of this upgrade — Hugo bump is a separate plan). - Production deploy target:
gh-pagesbranch ofowaspsamm/website. Do not deploy to this branch during testing — see test strategy. - Deadline: before 2026-06-02 (Node 24 forced at runtime). Hard deadline 2026-09-16 (Node 20 removed).
Invocation
When ready to execute: open this page, point me at it, and say “run the actions upgrade plan”. I’ll create the feature branch, edit the workflow, walk you through the test run on gh-pages-test, and stop for confirmation before we merge to main.
Why this is needed
The workflow uses five third-party actions still running on Node.js 20. GitHub has announced:
- 2026-06-02 — runners default to Node.js 24; Node 20 actions are forced to Node 24 at runtime (may break).
- 2026-09-16 — Node.js 20 removed from runners entirely.
Without action, the deploy pipeline will start producing runtime errors in June and will be hard-broken in September.
Secondary motivator: peaceiris/actions-gh-pages@v3 is the action that hung for 6 hours during the Vienna deploy on 2026-04-14. @v4 is the recommended upgrade path and is reported to be more reliable with the Pages deployment polling step.
Scope
Update .github/workflows/gh-pages.yaml with the following action versions:
| Action | Current | Target | Risk |
|---|---|---|---|
actions/checkout | v3 | v4 | low |
actions/cache | v3 | v4 | low |
peaceiris/actions-hugo | v2 | v3 | medium |
peaceiris/actions-gh-pages | v3 | v4 | medium |
EndBug/add-and-commit | v9 | v10 | medium |
Targets are one major above current to minimise risk. Latest-latest (checkout v6, cache v5) is fine too, but the above covers the Node 24 requirement without over-reaching.
Why not just bump to “latest”
The three medium-risk actions have breaking changes across major versions — input names, default behaviours, or token handling have shifted. Bumping one major per action and verifying is safer than jumping several.
Test strategy
Do not test on main. Use a feature branch with a throwaway publish target.
- Create branch
upgrade/actions-node24. - In the workflow on that branch only, change
peaceiris/actions-gh-pagespublish_branch: gh-pages→publish_branch: gh-pages-test. - Trigger via Actions → github pages → Run workflow against the branch (uses
workflow_dispatch). - Confirm the run reaches
deployjob success. - Inspect
gh-pages-testbranch contents — should mirror a normal build (public/tree). - Revert
publish_branchback togh-pagesin the branch. - Open PR, merge, confirm the next production deploy is green.
- Delete
gh-pages-testbranch afterwards.
If step 4 fails, we know which action broke and can roll that one back individually while keeping the safe ones.
Migration decision point
When v2 migration happens, we can either copy the upgraded peaceiris-based workflow as-is, or replace it with GitHub’s first-party Pages actions (actions/configure-pages + actions/upload-pages-artifact + actions/deploy-pages). The first-party option is less code, officially maintained, and avoids the peaceiris polling issue entirely. Either way, doing this upgrade first gives us a working baseline.
Out of scope (follow-up)
- Bumping Hugo beyond 0.157.0 (currently 0.160.1 is upstream latest). Keep as a separate PR — Hugo minor upgrades have historically required template fixes (see v1 commit
ae4f205). - Adopting branch protection on
mainto require passing CI before merge. Worth a separate conversation after the 2026-04-14 incident where a cancelled workflow’s commit later deployed on a teammate’s unrelated fix.
Open questions (resolve before execution)
- Are the target action versions still current and stable? The version table reflects what was latest on 2026-04-15. Before executing, re-run the version check — some actions may have released new majors since.
- Do we have permission to create branches and trigger
workflow_dispatchon the v1 repo? Assume yes (this is the standard contributor flow), but worth confirming if admin controls have tightened. - Is there anyone currently iterating on the v1 workflow? If yes, coordinate so we don’t collide.
Done checklist
-
upgrade/actions-node24branch created - Workflow edited with the five action bumps
-
publish_branchtemporarily set togh-pages-test -
workflow_dispatchrun completed with green deploy job -
gh-pages-testinspected — looks correct -
publish_branchreverted togh-pages - PR opened, reviewed, merged
- First post-merge production run green
-